Self Evaluation questions |
ELECTRICAL Department, RESTRUCTURED POWR SYSTEM by A R ABHYANKAR, |
IIT Delhi, New Delhi. |
|
Module 4 |
|
1.Write down various limits imposed by physical and electrical characteristics of electric power.
|
|
2.Pro-rata methods of congestion management are market-based methods. True or False. |
|
3.Why TTC is different from transmission capacity? |
|
4.Define Power Transfer Distribution Factor (PTDF). |
|
5. In a power system, as more and more transactions are imposed on the base case, the ATC |
|
- a)keeps on decreasing
- b)keeps on increasing
- c)remains same
- d) may decrease or increase
|
|
6. A certain network has 3 lines which are currently carrying 60 MW, 50 MW, and -80 MW respectively. (-ve sign indicates direction opposite to what we have initially assumed). The PTDF factors for a transaction between node m and n are 0.25, -0.3, 0.25, respectively. If maximum capacity of each line is 100 MW in either direction, what is the ATC between the nodes m and n. |
|
7. The PTDF factors are calculated for a certain power network based on DC load flow model. Which of the following statements are true? |
|
- a) PTDF factors change if base case changes
- b) PTDF factors do not change even if base case changes
- c) PTDF factors change when new transactions are imposed
- d) PTDF factors do not change even if new transactions are imposed
|
|
8. The PTDF factors are calculated for a certain power network based on AC load flow model. Which of the following statements are true? |
|
- a) PTDF factors change if base case changes
- b) PTDF factors do not change even if base case changes
- c) PTDF factors change when new transactions are imposed
- d) PTDF factors do not change even if new transactions are imposed
|
|
|
9. Explain in brief what do you understand by following terms: TTC, ATC, TRM |
|
|
10.Theoretically, what is the maximum numerical value the PTDF can take? |
|